You don't have javascript enabled. Good luck with that.
Pencarian
Lampu Sorot Dipasang di Lokasi Proyek Sudin Tata Air

Spotlight Installed at Project Location of Water Management Sub-dept

South Jakarta Industry and Energy Sub-dept has installed three spotlights powered 1,000 watts in two different locations, South Jakarta.

Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night

One spotlight was installed on the right side of Ciliwung River, Jalan Abdullah Syafei, Kebon Baru Urban Village, Tebet in which still being conducted a sheet pile installation. 

"Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night," expressed Ihsan, Head of Supervision and Control Section for South Jakarta Industry and Energy Sub-dept, Thursday (4/28).

Temporary Lightings Added for 14 City Forests

While for two other spotlights, were installed at decker reparation location, precisely on Jl Jagakarsa Raya, Jagakarsa Urban Village, due to collapse.

"We move the PLN cable, thus the sub-dept can easily install the spotlight. We support the lighting thus they can work from day until night," he finished.

Linked News
Popular News indeks
  1. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye805 personAldi Geri Lumban Tobing
  2. Jakarta Residents Welcome Rp1 Public Transport Fare

    access_time24-04-2026 remove_red_eye628 personNurito
  3. Limiting Gadget Use in Schools Expected to Boost Interaction and Reading Habits

    access_time24-04-2026 remove_red_eye598 personFakhrizal Fakhri
  4. Rano Leads Parking Arrangement on Jalan R.A. Kartini, Lebak Bulus

    access_time24-04-2026 remove_red_eye578 personBudhi Firmansyah Surapati
  5. PT JIEP Targets Shenzhen Businesses with Investment Offers

    access_time24-04-2026 remove_red_eye569 personAldi Geri Lumban Tobing